Hexagon MinePlan
Mine-planning product family; MineOperate and fleet capability remain separate product boundaries unless directly evidenced.
Compare Hexagon MinePlan vs RPM MinePlanner across mining planning and operations capabilities, product/module boundaries, evidence coverage and known research gaps.
TechSelectAI compares Hexagon MinePlan and RPM MinePlanner using recorded product evidence rather than user-specific recommendation scoring. Hexagon MinePlan currently has 0 supported, 13 conditional, 63 unknown/not-yet-verified, and 0 not-supported capabilities. RPM MinePlanner currently has 3 supported, 0 conditional, 73 unknown/not-yet-verified, and 0 not-supported capabilities. Known-fact confidence is 99% for Hexagon MinePlan and 100% for RPM MinePlanner. Latest recorded review or verification activity across the comparison: Sep 27, 2026.
This summary reflects recorded TechSelectAI evidence only. It is separate from buyer-specific Fit Score, Evidence Confidence, TechSelectAI Verified Reviews and Public Review Intelligence. Unknown means not yet verified, not unsupported.
Mine-planning product family; MineOperate and fleet capability remain separate product boundaries unless directly evidenced.
Mine planning and scheduling product; integration and deployment scope remain evidence-pending.
Different coverage percentages can reflect how much TechSelectAI has researched and verified, not which product is better. “Research pending” means the current evidence set is incomplete; it is not evidence that the product lacks the capability.
Status and confidence reflect recorded evidence. Unknown means not yet verified, not unsupported. In the summary above, TechSelectAI labels this state “research pending”.
| Capability | Hexagon MinePlan | RPM MinePlanner |
|---|---|---|
| Audit loggingData, Integration & Governance | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Fleet-system integrationData, Integration & Governance | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Historian or IoT integrationData, Integration & Governance | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Interoperability and governed accessData, Integration & Governance | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Public or documented APIsData, Integration & Governance | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Role-based access controlData, Integration & Governance | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Blast design and execution trackingDrill & Blast | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Blast reconciliationDrill & Blast | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Charging and initiation planningDrill & Blast | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Drill execution trackingDrill & Blast | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Drill pattern designDrill & Blast | Partially Supported99% confidenceMinePlan UG Engineering documents drill and blast CAD designs. This does not establish all drill-pattern or execution workflows. | Not Yet Verified0% confidence |
| Fragmentation analysisDrill & Blast | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Equipment state and cycle monitoringFleet & Dispatch | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Fleet dispatchFleet & Dispatch | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Operator trackingFleet & Dispatch | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Queue and route optimizationFleet & Dispatch | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Truck-shovel dispatchFleet & Dispatch | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Underground fleet assignmentFleet & Dispatch | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Block modelling and resource estimationGeology & Resource Modelling | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Drillhole database managementGeology & Resource Modelling | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Geological domains and codingGeology & Resource Modelling | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Geological interpretationGeology & Resource Modelling | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| GeostatisticsGeology & Resource Modelling | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Resource and reserve reporting supportGeology & Resource Modelling | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Validation and reconciliationGeology & Resource Modelling | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Wireframing and surfacesGeology & Resource Modelling | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Crusher and feed trackingGrade Control & Material | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Dig block managementGrade Control & Material | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Grade-control samplingGrade Control & Material | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Material reconciliationGrade Control & Material | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Ore and waste classificationGrade Control & Material | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Stockpile, blending and material trackingGrade Control & Material | Partially Supported99% confidenceMinePlan UG Engineering documents stockpiling and blending using its optimization engine. This named package is not universal entitlement. | Supported100% confidenceRPM MinePlanner explicitly integrates materials management and destination scheduling, captures mining and dumping movements, and manages waste destinations and stockpiles. This does not establish downstream plant tracking or every blending workflow. |
| Bench and berm designMine Design | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Design scenario comparisonMine Design | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Geotechnical design parametersMine Design | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Haul roads, dumps and stockpiles designMine Design | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Open-pit designMine Design | Partially Supported100% confidenceMinePlan OP Engineering packages include 3D CAD tools for open-pit planning and design. Package entitlement is not universal. | Not Yet Verified0% confidence |
| Pit phases and pushbacksMine Design | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Stope and development designMine Design | Partially Supported99% confidenceMinePlan UG Engineering documents detailed underground mine design. The reviewed source does not establish every stope and development method. | Not Yet Verified0% confidence |
| Underground mine designMine Design | Partially Supported100% confidenceMinePlan UG Engineering explicitly supports detailed underground mine designs. This named package is not universal MinePlan entitlement. | Not Yet Verified0% confidence |
| Mobile field executionOperational & Shift Planning | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Offline field operationOperational & Shift Planning | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Operator task assignmentOperational & Shift Planning | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Plan-versus-actual visibilityOperational & Shift Planning | Not Yet Verified0% confidenceNo current first-party MinePlan evidence was reviewed for product-bounded plan-versus-actual capability independent of MineOperate or UG Pro. | Not Yet Verified0% confidence |
| Shift and weekly planningOperational & Shift Planning | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Short interval controlOperational & Shift Planning | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Discrete-event simulationOptimization & Simulation | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Equipment and resource optimizationOptimization & Simulation | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Mathematical mine optimizationOptimization & Simulation | Partially Supported100% confidenceMinePlan OP Engineering Strategic explicitly uses pit optimization algorithms. This named package is not universal MinePlan entitlement. | Not Yet Verified0% confidence |
| Mine scenario simulationOptimization & Simulation | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Schedule optimizationOptimization & Simulation | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Value-chain optimizationOptimization & Simulation | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Collision avoidance integrationSafety & OT Integration | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Fatigue monitoring integrationSafety & OT Integration | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Operational geofencingSafety & OT Integration | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Proximity detection integrationSafety & OT Integration | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Safety, tracking or OT integrationSafety & OT Integration | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Activity-based schedulingScheduling | Partially Supported100% confidenceMinePlan Activity Scheduler is explicitly activity-based for named open-pit and underground packages. This is not universal MinePlan entitlement. | Not Yet Verified0% confidence |
| Blending constraints in schedulesScheduling | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Medium-term schedulingScheduling | Not Yet Verified0% confidence | Supported100% confidenceRPMGlobal explicitly describes MinePlanner as a midterm and strategic scheduling suite. Product configuration and mining-method scope remain buyer-validation items. |
| Production target and constraint modellingScheduling | Partially Supported99% confidenceMinePlan OP Engineering Long Term explicitly considers detailed mining limits in long-range planning. This named package is not universal entitlement. | Not Yet Verified0% confidence |
| Resource and equipment levellingScheduling | Partially Supported99% confidenceMinePlan UG Engineering documents assigning equipment to model mining processes. This does not establish every resource levelling method. | Not Yet Verified0% confidence |
| Schedule dependencies and calendarsScheduling | Partially Supported99% confidenceMinePlan Activity Scheduler is documented as activity-based scheduling. The reviewed package pages do not establish every calendar or dependency model. | Not Yet Verified0% confidenceThe reviewed first-party MinePlanner pages establish planning and scheduling scope but do not enumerate calendar or dependency modelling. |
| Schedule scenario comparisonScheduling | Not Yet Verified0% confidence | Supported100% confidenceRPM MinePlanner explicitly provides multi-scenario analysis for alternative what-if schedules and production scenarios. This does not imply strategic optimization methods outside MinePlanner. |
| Short-term production schedulingScheduling | Partially Supported100% confidenceMinePlan OP Engineering Short Term explicitly produces tactical schedules. This named package is not universal MinePlan entitlement. | Not Yet Verified0% confidence |
| Cut-off grade scenario modellingStrategic Planning | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Economic scenario analysisStrategic Planning | Partially Supported100% confidenceMinePlan OP Engineering Strategic explicitly evaluates multiple pit optimization and scheduling scenarios. This named package is not universal entitlement. | Not Yet Verified0% confidence |
| Life-of-mine planningStrategic Planning | Partially Supported100% confidenceMinePlan OP Engineering Strategic explicitly determines life-of-mine schedules. This named package is not universal MinePlan entitlement. | Not Yet Verified0% confidenceRPMGlobal explicitly documents strategic scheduling for MinePlanner, but the reviewed source does not directly establish the TechSelectAI life-of-mine planning criterion. |
| NPV optimizationStrategic Planning | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Pit or stope optimizationStrategic Planning | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Production capacity modellingStrategic Planning | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Drone and laser-scan integrationSurvey & Spatial | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Mining CAD and 3D visualizationSurvey & Spatial | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Spatial data managementSurvey & Spatial | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Survey and spatial-data integrationSurvey & Spatial | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
| Survey pickup and reconciliationSurvey & Spatial | Not Yet Verified0% confidence | Not Yet Verified0% confidence |
Comparison facts, TechSelectAI analysis, community-derived insights and estimates are kept as separate evidence types. Missing evidence is not treated as proof of non-support.
Adjust the context below. Context Fit is calculated from the same published TechSelectAI evaluation signals and scoring methodology; it does not replace verified product facts or the saved project Decision Matrix.
What could change this recommendation? Confirmed requirements, must-have failures, exact integrations, regional availability, pricing, security requirements, and implementation capacity can materially change fit. For a saved, reproducible decision with custom weights, use a Selection Project.
A feature comparison is not the same as a recommendation. TechSelectAI can evaluate both products against your must-have capabilities, integrations, deployment constraints, security requirements, region and budget.
Evaluate for my company